Articles
Article
Four Behaviours That Can Cause Cable Strikes on Site
Most strikes trace back to four things people do — or skip — during the pre-excavation survey. Knowing what causes them is the first step to preventing one.
Read →Article
Utility Strike Prevention: A Guide for Site Managers
Pre-dig procedure, training, supervision and what to do in the hour after a strike — written for the person running the site rather than the person holding the CAT.
Read →Article
Test Before Touch: A Recommendation to Adopt Voltsticks
Why anyone working on electrically connected street furniture should carry a voltstick: the risk, the fix, and how to roll Test Before Touch out across a workforce.